Optimizing Quilting Productivity: Project Completion and Summer Plans

I have so many PhDs (projects half done) at the moment. The vast majority fall into “finish assembling quilt top” or “to be quilted” categories. Instead of making blocks at this week’s library sew day, I focused on “completion tasks” I could accomplish with a smaller sewing machine. This meant adding and stitching down the binding (by machine) to a throw size donation quilt, plus making binding for two other quilts. I had hoped to complete the two “Layer Cake Shake” quilt tops currently under construction, but that was not to be. The collective eyes of my sew squad noticed I had one HST of a Friendship Star block turned the wrong way in my Christmas version of the Layer Cake Shake pattern. I completely missed it. You can actually see it in the previous photo collage of my retreat in Boise. It took a while to unpick all the blocks and correct my mistake. However, I’m glad they noticed it before I added the borders!

Most of my sewing time this week was spent finishing the foundation paper pieced Roses/Marigolds for Mother mini-quilt that was one of our retreat projects. It turned out so pretty! Backing and binding came from my stash. I machine quilted it using a loopy meander. While at the retreat, I made a single flower and leaf unit using a borrowed add-a-quarter plus ruler. The quilt shop had sold out of them, but my trusty friends at Amazon were able to supply me with one once I returned home. The finished project will be gifted to my mom on Mother’s Day.

It felt really good to complete two projects this week. Tracking project progress in a small flexible notebook (currently a Leuchtturm1917 B6+ softcover purchased in 2021) has been helpful. I used to do this when I was working full-time to make the best use of my limited sewing time. I pack it to take to classes and retreats, as well. A 5″ x 8″ (or A5 size) notebook would also work; however, coils on a spiral binding tend to get caught on stuff in my tote bag. All my sewing related notes, tasks, ideas, etc. go into one of these notebooks. When it gets full, I go through and transfer the information/items I want to keep to a separate 3-ring binder. This only takes about 15 minutes. I keep original design sketches, teaching notes, inspirational quotes, and any tips/tricks/product info I may need later. It usually amounts to less than 10 pages per notebook that I keep.

I plan to spend the hot summer months in the quilt cave practicing my FMQ skills on several charity quilt tops in my PhD pile. I should feel confident enough after 10 charity quilts to tackle FMQ on a two important personal projects. I won’t be spending my entire summer in the basement, however. Summer quilty plans also include helping out at the quilt show, mentoring at the SQTM quilt camp, a trip to Missouri Star and the International Quilt Study Center in late June, plus hosting a summer CraftLAB camp in mid-July.

August and September will bring the return of quilty travel in the form of a quilt retreat at the Koosa Mountain Lodge in August with my Friday sew squad and visiting the Asheville Quilt Show at the end of September.